Week Commencing Monday 22nd August
A second round of assistance from Southern Electric and Xcav8 has allowed us to start th bulk earthmoving.
Thanks to the assistance of Southern Electric and the support of their excavation contractor Xcav8 we have been able to undertake a week of bulk excavation.
We have lowered the area the area inside the new vehicular access down to a level similar to to the car park level so that vehicles can drive onto the site by this route and the area of the proposed canoe store has been lowered to the level of the underside of the structural floor slab. It is now practical to plan for the construction of the canoe store foundations.