Saturday 22nd February
Today is the day that we resolved to finish moving all the heaps so the site is clean and tidy, ready to hand over to a contractor to build the clubhouse.
The focus for today was to rid the site of all those nagging heaps and holes, starting with the residual hardcore!
- The small pile of topsoil recovered from the hardcore was added to that already in storage in jumbo bags.
- We backfilled around the various chambers at the main gates.
- The remaining crushed limestone was either used or transferred to storage in a jumbo bag.
- All the tricks and branches blown down by the winter gales were collected and burnt.
Thanks to Carol, Chester, Chris, Colin, Colin, Dan, Dave, Ian, Peter, Peter, Rusty, Stefan, and Wendy for their hard work.