Page 5 of 7
We have had two digger days in 2013 during which we have removed over 80 cubic metres of unwanted subsoil. The first was in June and the second in August. We have removed all the heaps of soil that were leftover from fencing, drainage and creating the hardstanding. We have excavated inside the main gates so that the vehicular hardstanding can be extended.